Interaction mechanism of tunnel excavation and overlying building loads in shallow-buried coastal urban tunnels

Shallow coastal tunnels excavated beneath buildings can deform under the combined effects of excavation, groundwater and structural loading, but their coupled response remains unclear. We investigated the onshore section of the Second Qingdao Jiaozhou Bay Subsea Tunnel using a hydro-mechanical physical model, finite-element simulations and field monitoring. The model test and simulations identified upper-bench excavation of the right pilot tunnel beneath the building as a stage of pronounced deformation. Field settlement profiles showed a similar overall pattern, although peak magnitudes and locations differed; they could not establish the timing of the peak response. In the zero-offset, 0°numerical configuration, seepage increased maximum crown displacement from 22.7 to 28.9 mm (27.3%) relative to the no-seepage reference. Building loading deepened and narrowed the settlement trough, while building offset shifted the trough and altered differential settlement. At zero offset, increasing crossing angle raised peak ground-surface settlement and narrowed the trough. These findings identify excavation stage, groundwater and tunnel-building geometry as joint controls on deformation in this case and inform monitoring of comparable coastal tunnels.

Read more here: Source link